Q. 1समय और कार्य
A can finish a work in 6 days, B in 10 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (16)/(60); days ≈ 4.
Q. 2समय और कार्य
A finishes a work in 8 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: B
One day = 1/8 = 12%.
Q. 3समय और कार्य
A: 10 days, B: 14 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 140/24 ≈ 6 days.
Q. 4समय और कार्य
A can finish a work in 12 days, B in 16 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (28)/(192); days ≈ 7.
Q. 5समय और कार्य
A finishes a work in 14 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/14 = 7%.
Q. 6समय और कार्य
A: 16 days, B: 20 days. Approximate days if they work together
Answer / solution
Correct option: B
Product/sum = 320/36 ≈ 9 days.
Q. 7समय और कार्य
A can finish a work in 18 days, B in 22 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: D
1/A+1/B = (40)/(396); days ≈ 10.
Q. 8समय और कार्य
A finishes a work in 20 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/20 = 5%.
Q. 9समय और कार्य
A: 6 days, B: 10 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 60/16 ≈ 4 days.
Q. 10समय और कार्य
A can finish a work in 8 days, B in 12 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: A
1/A+1/B = (20)/(96); days ≈ 5.
Q. 11समय और कार्य
A finishes a work in 10 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/10 = 10%.
Q. 12समय और कार्य
A: 12 days, B: 16 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 192/28 ≈ 7 days.
Q. 13समय और कार्य
A can finish a work in 14 days, B in 18 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (32)/(252); days ≈ 8.
Q. 14समय और कार्य
A finishes a work in 16 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/16 = 6%.
Q. 15समय और कार्य
A: 18 days, B: 22 days. Approximate days if they work together
Answer / solution
Correct option: D
Product/sum = 396/40 ≈ 10 days.
Q. 16समय और कार्य
A can finish a work in 20 days, B in 24 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (44)/(480); days ≈ 11.
Q. 17समय और कार्य
A finishes a work in 6 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: C
One day = 1/6 = 16%.
Q. 18समय और कार्य
A: 8 days, B: 12 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 96/20 ≈ 5 days.
Q. 19समय और कार्य
A can finish a work in 10 days, B in 14 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (24)/(140); days ≈ 6.
Q. 20समय और कार्य
A finishes a work in 12 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/12 = 8%.
Q. 21समय और कार्य
A: 14 days, B: 18 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 252/32 ≈ 8 days.
Q. 22समय और कार्य
A can finish a work in 16 days, B in 20 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (36)/(320); days ≈ 9.
Q. 23समय और कार्य
A finishes a work in 18 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/18 = 5%.
Q. 24समय और कार्य
A: 20 days, B: 24 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 480/44 ≈ 11 days.
Q. 25समय और कार्य
A can finish a work in 6 days, B in 10 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (16)/(60); days ≈ 4.
Q. 26समय और कार्य
A finishes a work in 8 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: B
One day = 1/8 = 12%.
Q. 27समय और कार्य
A: 10 days, B: 14 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 140/24 ≈ 6 days.
Q. 28समय और कार्य
A can finish a work in 12 days, B in 16 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (28)/(192); days ≈ 7.
Q. 29समय और कार्य
A finishes a work in 14 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/14 = 7%.
Q. 30समय और कार्य
A: 16 days, B: 20 days. Approximate days if they work together
Answer / solution
Correct option: B
Product/sum = 320/36 ≈ 9 days.
Q. 31समय और कार्य
A can finish a work in 18 days, B in 22 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: D
1/A+1/B = (40)/(396); days ≈ 10.
Q. 32समय और कार्य
A finishes a work in 20 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/20 = 5%.
Q. 33समय और कार्य
A: 6 days, B: 10 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 60/16 ≈ 4 days.
Q. 34समय और कार्य
A can finish a work in 8 days, B in 12 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: A
1/A+1/B = (20)/(96); days ≈ 5.
Q. 35समय और कार्य
A finishes a work in 10 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/10 = 10%.
Q. 36समय और कार्य
A: 12 days, B: 16 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 192/28 ≈ 7 days.
Q. 37समय और कार्य
A can finish a work in 14 days, B in 18 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (32)/(252); days ≈ 8.
Q. 38समय और कार्य
A finishes a work in 16 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/16 = 6%.
Q. 39समय और कार्य
A: 18 days, B: 22 days. Approximate days if they work together
Answer / solution
Correct option: D
Product/sum = 396/40 ≈ 10 days.
Q. 40समय और कार्य
A can finish a work in 20 days, B in 24 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (44)/(480); days ≈ 11.
Q. 41समय और कार्य
A finishes a work in 6 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: C
One day = 1/6 = 16%.
Q. 42समय और कार्य
A: 8 days, B: 12 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 96/20 ≈ 5 days.
Q. 43समय और कार्य
A can finish a work in 10 days, B in 14 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (24)/(140); days ≈ 6.
Q. 44समय और कार्य
A finishes a work in 12 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/12 = 8%.
Q. 45समय और कार्य
A: 14 days, B: 18 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 252/32 ≈ 8 days.
Q. 46समय और कार्य
A can finish a work in 16 days, B in 20 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (36)/(320); days ≈ 9.
Q. 47समय और कार्य
A finishes a work in 18 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/18 = 5%.
Q. 48समय और कार्य
A: 20 days, B: 24 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 480/44 ≈ 11 days.
Q. 49समय और कार्य
A can finish a work in 6 days, B in 10 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (16)/(60); days ≈ 4.
Q. 50समय और कार्य
A finishes a work in 8 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: B
One day = 1/8 = 12%.
Q. 51समय और कार्य
A: 10 days, B: 14 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 140/24 ≈ 6 days.
Q. 52समय और कार्य
A can finish a work in 12 days, B in 16 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (28)/(192); days ≈ 7.
Q. 53समय और कार्य
A finishes a work in 14 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/14 = 7%.
Q. 54समय और कार्य
A: 16 days, B: 20 days. Approximate days if they work together
Answer / solution
Correct option: B
Product/sum = 320/36 ≈ 9 days.
Q. 55समय और कार्य
A can finish a work in 18 days, B in 22 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: D
1/A+1/B = (40)/(396); days ≈ 10.
Q. 56समय और कार्य
A finishes a work in 20 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/20 = 5%.
Q. 57समय और कार्य
A: 6 days, B: 10 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 60/16 ≈ 4 days.
Q. 58समय और कार्य
A can finish a work in 8 days, B in 12 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: A
1/A+1/B = (20)/(96); days ≈ 5.
Q. 59समय और कार्य
A finishes a work in 10 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/10 = 10%.
Q. 60समय और कार्य
A: 12 days, B: 16 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 192/28 ≈ 7 days.
Q. 61समय और कार्य
A can finish a work in 14 days, B in 18 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (32)/(252); days ≈ 8.
Q. 62समय और कार्य
A finishes a work in 16 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/16 = 6%.
Q. 63समय और कार्य
A: 18 days, B: 22 days. Approximate days if they work together
Answer / solution
Correct option: D
Product/sum = 396/40 ≈ 10 days.
Q. 64समय और कार्य
A can finish a work in 20 days, B in 24 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (44)/(480); days ≈ 11.
Q. 65समय और कार्य
A finishes a work in 6 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: C
One day = 1/6 = 16%.
Q. 66समय और कार्य
A: 8 days, B: 12 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 96/20 ≈ 5 days.
Q. 67समय और कार्य
A can finish a work in 10 days, B in 14 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (24)/(140); days ≈ 6.
Q. 68समय और कार्य
A finishes a work in 12 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/12 = 8%.
Q. 69समय और कार्य
A: 14 days, B: 18 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 252/32 ≈ 8 days.
Q. 70समय और कार्य
A can finish a work in 16 days, B in 20 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (36)/(320); days ≈ 9.
Q. 71समय और कार्य
A finishes a work in 18 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/18 = 5%.
Q. 72समय और कार्य
A: 20 days, B: 24 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 480/44 ≈ 11 days.
Q. 73समय और कार्य
A can finish a work in 6 days, B in 10 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (16)/(60); days ≈ 4.
Q. 74समय और कार्य
A finishes a work in 8 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: B
One day = 1/8 = 12%.
Q. 75समय और कार्य
A: 10 days, B: 14 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 140/24 ≈ 6 days.
Q. 76समय और कार्य
A can finish a work in 12 days, B in 16 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (28)/(192); days ≈ 7.
Q. 77समय और कार्य
A finishes a work in 14 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/14 = 7%.
Q. 78समय और कार्य
A: 16 days, B: 20 days. Approximate days if they work together
Answer / solution
Correct option: B
Product/sum = 320/36 ≈ 9 days.
Q. 79समय और कार्य
A can finish a work in 18 days, B in 22 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: D
1/A+1/B = (40)/(396); days ≈ 10.
Q. 80समय और कार्य
A finishes a work in 20 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/20 = 5%.
Q. 81समय और कार्य
A: 6 days, B: 10 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 60/16 ≈ 4 days.
Q. 82समय और कार्य
A can finish a work in 8 days, B in 12 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: A
1/A+1/B = (20)/(96); days ≈ 5.
Q. 83समय और कार्य
A finishes a work in 10 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/10 = 10%.
Q. 84समय और कार्य
A: 12 days, B: 16 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 192/28 ≈ 7 days.
Q. 85समय और कार्य
A can finish a work in 14 days, B in 18 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (32)/(252); days ≈ 8.
Q. 86समय और कार्य
A finishes a work in 16 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/16 = 6%.
Q. 87समय और कार्य
A: 18 days, B: 22 days. Approximate days if they work together
Answer / solution
Correct option: D
Product/sum = 396/40 ≈ 10 days.
Q. 88समय और कार्य
A can finish a work in 20 days, B in 24 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (44)/(480); days ≈ 11.
Q. 89समय और कार्य
A finishes a work in 6 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: C
One day = 1/6 = 16%.
Q. 90समय और कार्य
A: 8 days, B: 12 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 96/20 ≈ 5 days.
Q. 91समय और कार्य
A can finish a work in 10 days, B in 14 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (24)/(140); days ≈ 6.
Q. 92समय और कार्य
A finishes a work in 12 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/12 = 8%.
Q. 93समय और कार्य
A: 14 days, B: 18 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 252/32 ≈ 8 days.
Q. 94समय और कार्य
A can finish a work in 16 days, B in 20 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (36)/(320); days ≈ 9.
Q. 95समय और कार्य
A finishes a work in 18 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/18 = 5%.
Q. 96समय और कार्य
A: 20 days, B: 24 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 480/44 ≈ 11 days.
Q. 97समय और कार्य
A can finish a work in 6 days, B in 10 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (16)/(60); days ≈ 4.
Q. 98समय और कार्य
A finishes a work in 8 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: B
One day = 1/8 = 12%.
Q. 99समय और कार्य
A: 10 days, B: 14 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 140/24 ≈ 6 days.
Q. 100समय और कार्य
A can finish a work in 12 days, B in 16 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (28)/(192); days ≈ 7.
Q. 101समय और कार्य
A finishes a work in 14 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/14 = 7%.
Q. 102समय और कार्य
A: 16 days, B: 20 days. Approximate days if they work together
Answer / solution
Correct option: B
Product/sum = 320/36 ≈ 9 days.
Q. 103समय और कार्य
A can finish a work in 18 days, B in 22 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: D
1/A+1/B = (40)/(396); days ≈ 10.
Q. 104समय और कार्य
A finishes a work in 20 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/20 = 5%.
Q. 105समय और कार्य
A: 6 days, B: 10 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 60/16 ≈ 4 days.
Q. 106समय और कार्य
A can finish a work in 8 days, B in 12 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: A
1/A+1/B = (20)/(96); days ≈ 5.
Q. 107समय और कार्य
A finishes a work in 10 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/10 = 10%.
Q. 108समय और कार्य
A: 12 days, B: 16 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 192/28 ≈ 7 days.
Q. 109समय और कार्य
A can finish a work in 14 days, B in 18 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (32)/(252); days ≈ 8.
Q. 110समय और कार्य
A finishes a work in 16 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/16 = 6%.
Q. 111समय और कार्य
A: 18 days, B: 22 days. Approximate days if they work together
Answer / solution
Correct option: D
Product/sum = 396/40 ≈ 10 days.
Q. 112समय और कार्य
A can finish a work in 20 days, B in 24 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (44)/(480); days ≈ 11.
Q. 113समय और कार्य
A finishes a work in 6 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: C
One day = 1/6 = 16%.
Q. 114समय और कार्य
A: 8 days, B: 12 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 96/20 ≈ 5 days.
Q. 115समय और कार्य
A can finish a work in 10 days, B in 14 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (24)/(140); days ≈ 6.
Q. 116समय और कार्य
A finishes a work in 12 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/12 = 8%.
Q. 117समय और कार्य
A: 14 days, B: 18 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 252/32 ≈ 8 days.
Q. 118समय और कार्य
A can finish a work in 16 days, B in 20 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (36)/(320); days ≈ 9.
Q. 119समय और कार्य
A finishes a work in 18 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/18 = 5%.
Q. 120समय और कार्य
A: 20 days, B: 24 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 480/44 ≈ 11 days.
Q. 121समय और कार्य
A can finish a work in 6 days, B in 10 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (16)/(60); days ≈ 4.
Q. 122समय और कार्य
A finishes a work in 8 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: B
One day = 1/8 = 12%.
Q. 123समय और कार्य
A: 10 days, B: 14 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 140/24 ≈ 6 days.
Q. 124समय और कार्य
A can finish a work in 12 days, B in 16 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (28)/(192); days ≈ 7.
Q. 125समय और कार्य
A finishes a work in 14 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/14 = 7%.
Q. 126समय और कार्य
A: 16 days, B: 20 days. Approximate days if they work together
Answer / solution
Correct option: B
Product/sum = 320/36 ≈ 9 days.
Q. 127समय और कार्य
A can finish a work in 18 days, B in 22 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: D
1/A+1/B = (40)/(396); days ≈ 10.
Q. 128समय और कार्य
A finishes a work in 20 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/20 = 5%.
Q. 129समय और कार्य
A: 6 days, B: 10 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 60/16 ≈ 4 days.
Q. 130समय और कार्य
A can finish a work in 8 days, B in 12 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: A
1/A+1/B = (20)/(96); days ≈ 5.
Q. 131समय और कार्य
A finishes a work in 10 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/10 = 10%.
Q. 132समय और कार्य
A: 12 days, B: 16 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 192/28 ≈ 7 days.
Q. 133समय और कार्य
A can finish a work in 14 days, B in 18 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (32)/(252); days ≈ 8.
Q. 134समय और कार्य
A finishes a work in 16 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/16 = 6%.
Q. 135समय और कार्य
A: 18 days, B: 22 days. Approximate days if they work together
Answer / solution
Correct option: D
Product/sum = 396/40 ≈ 10 days.
Q. 136समय और कार्य
A can finish a work in 20 days, B in 24 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (44)/(480); days ≈ 11.
Q. 137समय और कार्य
A finishes a work in 6 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: C
One day = 1/6 = 16%.
Q. 138समय और कार्य
A: 8 days, B: 12 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 96/20 ≈ 5 days.
Q. 139समय और कार्य
A can finish a work in 10 days, B in 14 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (24)/(140); days ≈ 6.
Q. 140समय और कार्य
A finishes a work in 12 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/12 = 8%.
Q. 141समय और कार्य
A: 14 days, B: 18 days. Approximate days if they work together
Answer / solution
Correct option: A
Product/sum = 252/32 ≈ 8 days.
Q. 142समय और कार्य
A can finish a work in 16 days, B in 20 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: C
1/A+1/B = (36)/(320); days ≈ 9.
Q. 143समय और कार्य
A finishes a work in 18 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: D
One day = 1/18 = 5%.
Q. 144समय और कार्य
A: 20 days, B: 24 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 480/44 ≈ 11 days.
Q. 145समय और कार्य
A can finish a work in 6 days, B in 10 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (16)/(60); days ≈ 4.
Q. 146समय और कार्य
A finishes a work in 8 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: B
One day = 1/8 = 12%.
Q. 147समय और कार्य
A: 10 days, B: 14 days. Approximate days if they work together
Answer / solution
Correct option: C
Product/sum = 140/24 ≈ 6 days.
Q. 148समय और कार्य
A can finish a work in 12 days, B in 16 days. Together they finish it in (nearest whole day)
Answer / solution
Correct option: B
1/A+1/B = (28)/(192); days ≈ 7.
Q. 149समय और कार्य
A finishes a work in 14 days. A’s one-day work as a percent of the whole is
Answer / solution
Correct option: A
One day = 1/14 = 7%.
Q. 150समय और कार्य
A: 16 days, B: 20 days. Approximate days if they work together
Answer / solution
Correct option: B
Product/sum = 320/36 ≈ 9 days.
FAQs
Are these previous-year SSC questions?
No year or shift is claimed on these pages. Each maths section has 150 original practice MCQs. When a verified source database exists, a question will show exam + year; until then it is practice.
Where are Class 10 board formulas?
The CBSE formula sheet at /cbse/class-10/mathematics/formulas/ stays the canonical board list. This maths hub links to it instead of copying every line.
Do you publish tricks that are only sometimes true?
Every shortcut page states when the trick must not be used. A speed trick that fails on close options is not published as if it were a theorem.
Today's 3-step path
Follow this loop every day: mixed test, current affairs, then today's subject. A new set arrives tomorrow.